Feasibility Study

This is 27 frames long, and took 3 hours.  (e.g. 9 frames per hour) Even though I didn't finish the arms I'll use it as an example.

Suppose I animated an average of two characters, and the whole film was three minutes long at 24 frames per second.

So from that let's assume it'd takes a total of 960 hours to finish the whole film.  If I worked 8 hours a day including weekends, then it'd take 120 days, or 4 months.

That's not including the colouring in or the backgrounds!